29 April 2011

Fish room remodel 4/29/11


Three bays complete. The last two bays will have top view troughs for the TVR and raising of fry.



Last bay installed and plumbing completed. I will need to upgrade my pump to something that does about 60 gpm of flow. This will allow me to plumb tanks along the top row as well as the 55 gallon rack on the end. Next up is the remodeling the east wall of the room.

No comments:

Post a Comment